Verification testing of the Atlantic Ultraviolet Megatron M250 system was conducted over a 48-day period from 11/01/01 to 12/18/01.
The feedwater to the ultraviolet (UV) unit during the testing was effluent from the Otay Water Treatment Plant (OWTP), a conventional plant with flocculation, sedimentation and dual-media filtration of Otay lake water.
In the first part of the testing, microbial challenge tests were conducted on 11/14/01 at a flow rate of 350 10% gpm, lamp power of 100% and feed water...
Post new comment